Stormwater Drainage Upgrade

Stormwater Drainage Upgrade

Procare Maintenance Group delivered a stormwater drainage upgrade within a multi-residential strata building on Riversdale Road, Hawthorn, addressing ongoing water accumulation at the main entry.

The works involved a coordinated approach across drainage installation, structural modification and surface reinstatement, completed within an occupied environment with maintained access throughout.

The Challenge

The existing entry lacked adequate drainage, resulting in surface water pooling, increased slip risk and potential water ingress. The solution required integration into an existing tiled entry with limited falls, while ensuring minimal disruption to occupants.

Scope of Works

  • Tile cutting and removal
  • Concrete core drilling
  • Installation of stormwater pipework
  • Connection to existing drainage system
  • Installation of linear trench drainage
  • Surface reinstatement and finishing

Our Approach

A structured methodology was implemented to achieve a long-term outcome:

  • Assessment of existing levels and drainage constraints
  • Set-out and installation of new drainage system
  • Controlled tile cutting and core drilling
  • Installation of new stormwater pipework
  • Integration of linear trench drainage
  • Reinstatement of finishes to match existing condition

Scope of Works

  • Tile cutting and removal
  • Concrete core drilling
  • Installation of stormwater pipework
  • Connection to existing drainage system
  • Installation of linear trench drainage
  • Surface reinstatement and finishing

Outcome

The completed works delivered an integrated drainage solution, improving water management at the entry, enhancing safety and reducing the risk of water ingress, with a clean finish aligned to the existing building.